Brief summaries of turnkey project solution examples to be used on the turnkey solutions page under the Services menu item

The customer goal: purchase seventeen autoclaves in various sizes for a new research center.

The deliverables: autoclaves were installed in a metropolitan amidst new construction, with user training following building commissioning.

Two men, each wearing hard hats, stand on a concrete floor next to a construction area marked off with caution tape indoors. Behind them are large metal structures and various construction materials. The space appears to be an unfinished industrial or commercial building.
Life Science Equipment

The customer goal: contract with one supplier to provide an entire new bean processing line.

The deliverables: all equipment was manufactured in Pennsylvania, with delivery, installation, and site testing completed in Colorado.

A large industrial facility with multiple metallic tanks, pipes, and walkways. A person wearing a red shirt and khaki pants is standing near equipment and storage boxes. The area is well-lit with overhead lights and has a high ceiling.
Food Processing Line

The goal: to bring improved fuel/air control to a power generation facility.

The deliverables: R-V provided equipment design and fabrication, installation support, and unit tuning to achieve the customer goal.

An industrial machine with a heavy-duty, rust-colored metal frame featuring multiple bolted sections and large cylindrical components. The image displays a partial cutaway view, revealing the internal structure. The machine is set against a blurred workshop backdrop.
Power Generation