That's a Whole lot of Weld Wire!
R-V Industries completed a multi-year, multi-million-dollar manufacturing project to supply multiple steam dryers that will be used at the nearby Peach Bottom Nuclear Power Plant in York County, Pennsylvania. Thanks to a long history of manufacturing excellence and NQA-1 certification with customer-acclaimed nuclear manufacturing experience, R-V was entrusted to build a complex and mission critical steam dryer for the plant.
This project was one of the most complex projects we have ever undertaken, right down to the delivery, which entailed a 7-car police escort and the delicate lifting of power lines and stop lights! However, the most impressive part of the steam dryer project was the amount of manual welding and inspection that was required. The project required so much welding that we consumed over 2.5 tons of weld wire! But 2.5 tons is difficult to put into the context of everyday life. Take a look at the chart below, and prepare to be amazed (just as we were!).